Time for the ol "What needs doing before HVC" thread. Ill start
- Oil change and UEC
- Regas AC
- Paint and install guard trim things (unlikely)
- 2.7 STi rack (would like to do)
- EL Headers (would like to do)
- Halfmoon sump (oi wob, come here 4 a sec)
- PFC (also a maybe)
Theres probably a million other things ive forgotten but thats the main list for now